THE CHALLENGE: Design and the construction (turnkey). The management of the industrial project carried out by an architectural team of the same construction company and the fixed price of the contract required coordination and management levels well above the usual standards in Spain. A 3-dimensional design system was made available, predecessor of the current BIM system, which enabled the accuracy in the rethinking and rigor in the coordination.